A spare part from first request to requisition in weeks, not months

A routine spare such as a pump seal takes the same research, enquiries and approvals as a major tender. Velocity does the research, gathers demand across sites and gets real prices before the requisition is raised.

A national oil & gas producer with offshore assets

Offshore production platform standing in calm sea at sunset

~4 weeks

from weeks to several months

from first request to purchase requisition

Pilot target

8 vendors

from 1–2

asked for a price on each item

Worked example

1

from 4

requisition for the same part across four sites

Worked example

14 documents

read to identify the exact part

Worked example

Pilot target: the success measure a pilot is held to. Worked example: from a walkthrough on representative data.

The problem

Before anyone can raise an indent — the site's formal request for material — an engineer at the site digs through drawings, datasheets, manuals and old purchase files to work out exactly which part is needed and roughly what it costs. That research is not recorded anywhere, so nobody sees how long it takes.

Gaps in the specification surface only at tender stage, and the purchase is delayed or re-tendered. Enquiries go to one or two vendors, often late, and estimates lean on purchase rates that are years old. Meanwhile the part is needed on a platform at sea.

What it costs today

Site research before an indent
1 week to a few months, unrecorded
Clarifications before a requisition
up to 1–2 months
Estimate against final award
49% below to 137% above

Process timings from the operator's own mapping; estimate variance from a government audit report (2025).

The solution: a team of specialist agents

Site

Identifies the exact part, the quantity needed and an approximate cost.

Engineering review

Gathers the same need across sites, runs price discovery and raises one requisition.

Central procurement

Secures Finance sign-off and drafts the tender terms.

Monitor

Tracks every requirement to tender and chases whoever is holding it.

How it works

One case, step by step, in the systems the team already uses. An illustrative case: names, times and figures are representative.

  1. Day 1, 09:40

    Site engineer

    “The mechanical seal on the B water-injection booster pump is leaking. Shaft around 80 mm.”

  2. Day 1, 09:46

    Velocity · Drawings · Datasheets · SAP

    Read 14 documents and found the pump. The seal was upgraded to a double seal in 2021 — one question on the barrier-fluid pot. Two matching seals, with last price and source.

  3. Day 1, 10:05

    Site engineer

    “Selected the seal.”

  4. Day 1, 11:30

    Velocity · SAP · Email

    Stock checked at three stores, sister platforms asked: 6 needed here. Approximate cost ₹53.10 lakh (about $60,000) from the last purchase rate, adjusted for inflation. Indent sent for sanction.

  5. Day 2

    Velocity · Email · SAP

    Four other sites asked. 12 needed in total, net of their own stock — one requisition instead of four.

  6. Day 8

    Velocity · Email · Government procurement portal

    5 of 8 vendors quoted, ₹8.60–9.10 lakh each (about $9,800–10,300). Recommends one tender for all 12.

  7. Day 8

    Engineering reviewer

    “Create the requisition.”

  8. Day 13

    Velocity · SAP

    Finance signed off. Tender terms drafted — bid value, delivery, bid security, evaluation rules — for the buyer to verify.

Before, and with Velocity

StepBeforeWith Velocity
Identifying the partAn engineer searches drawings and files by handFound from 14 documents, with sources shown
QuantityEach site raises its own indentNeed gathered across sites, net of stock
Price1–2 vendors, rates years old8 vendors asked, real quotes in a week
SpecificationGaps found at tenderChecked against the last approved spec first
Follow-upNobody sees where it is stuckEvery requirement tracked to tender

What stays with your people

Nothing is issued until the authorised approver signs off under the company's delegation-of-authority rules. A specification that differs from the last approved one goes to the site's technical owner. Vendor replies asking for internal information or bank changes are held.

Works inside

SAP (materials, maintenance, master data) · Government procurement portal · Email · Drawings & CAD · Datasheets & manuals

How a pilot runs

Sixteen weeks on one item category at one site, reported against the last twelve months of cases.

Book a demo

Questions

What does Velocity do for maintenance procurement?

A routine spare such as a pump seal takes the same research, enquiries and approvals as a major tender. Velocity does the research, gathers demand across sites and gets real prices before the requisition is raised. The work is split between specialist agents: Site — Identifies the exact part, the quantity needed and an approximate cost; Engineering review — Gathers the same need across sites, runs price discovery and raises one requisition; Central procurement — Secures Finance sign-off and drafts the tender terms; Monitor — Tracks every requirement to tender and chases whoever is holding it.

What results does it deliver?

~4 weeks (from weeks to several months) from first request to purchase requisition — pilot target; 8 vendors (from 1–2) asked for a price on each item — worked example; 1 (from 4) requisition for the same part across four sites — worked example; 14 documents read to identify the exact part — worked example. Every figure is labelled as measured in production, a pilot target, or a worked example on representative data.

Which systems does it work in?

SAP (materials, maintenance, master data), Government procurement portal, Email, Drawings & CAD, Datasheets & manuals. Velocity logs in with its own account and the permissions your IT team grants; there is no data migration or integration project.

What stays with your people?

Nothing is issued until the authorised approver signs off under the company's delegation-of-authority rules. A specification that differs from the last approved one goes to the site's technical owner. Vendor replies asking for internal information or bank changes are held.

How does a pilot run?

Sixteen weeks on one item category at one site, reported against the last twelve months of cases.

More of the work